Tuesday, October 20, 2009

Main Stand Box Repairs Done

SPR sent out a notice that repairs were required on the main stand box on the East side of 57th Ave. and Cactus. These repairs were made last week.

Crack in the side of the box.
Crack in the top of the box.
Gate tracks inside of box were re-secured to concrete, and gate was greased.

Grime was ground off box walls and sealed with a two coat water proofing, masonry system.

Sediment was removed from bottom of the box.


Metal grate on top secured with additional bolts.

No comments:

Post a Comment